Kobo Consulting
Kobo Consulting Track Record
Of the 20 major items experiencing both overstock and stockouts, we narrowed down to five with significant impact, and conducted everything from business issue organization to PoC verification within 10 weeks. This is a proven track record of comparing six cases across three demand scenarios × two inventory policies, and determining the scope to implement next.
| item | Contents |
|---|---|
| Target Area | Inventory and Production Planning |
| Support Details | Business Issue Organization, PoC, Analysis & Optimization Design |
| Period | 10 weeks (2 weeks for organizing issues, 6 weeks for PoC design/analysis, 2 weeks for organizing implementation policies) |
| Eligible Items | Of the 20 major items, 5 have the highest impact |
| Number of Verification Cases | 3 demand scenarios × 2 inventory policies = 6 cases |
| deliverable | Issue summary report, PoC code, implementation policy document |
Challenges
At 20 major items, both overstock and shortages occurred simultaneously, making it difficult to see which items or processes needed improvement. Analyzing all items at once would take too much time and cost, so it was necessary to first focus on the scope of impact for verification.
Therefore, after organizing business issues and data status, we narrowed down to five items with significant impact and conducted a PoC comparing the combination of demand fluctuations and inventory policies.
How to proceed
Organizing business issues (weeks 1–2)
We identified factors that influenced decision-making, such as inventory, delivery dates, production capacity, and order units, and selected five items with significant impact from 20 options.
PoC Design and Analysis (Weeks 3–8)
For five items, six cases combining three demand scenarios (flat, increase, decrease) and two inventory policies (current operation and review proposals) were compared using demand forecasting and inventory simulation.
Organizing implementation policies (weeks 9–10)
From the comparison results of six cases, we narrowed down the combinations expected to be effective and organized the screens and reports necessary for business operations.
Results
Through comparing five items and six cases, we clarified which items had significant room for improvement and which data items needed to be developed first.
Based on the PoC results, we were able to organize our plan to move toward business reports and estimation tools in the next phase, while also looking ahead to expanding to the remaining 15 items.